TOTAL Petrochemical 2008 Sulfolane / BTX Turnaround - Tray-Tec performed all the tower work in the turnaround, including a complete retray of 90 trays with tower attachment modifications in a 10'-0" diameter tower.  www.totalpetrochemicals.com

Husky Refining 2008- Modified existing internals in reactor, welded in new Jaeger Products reactor internals. Visit Jaeger Products at www.jaeger.com for information regarding their internals.

Theraldson Ethanol 2008 - Installed new AMISTCO trays in two 17'-0" diameter towers.  Visit AMISTCO at www.amistco.com for information regarding their internals.

BP America, Inc. 2008 - Vacuum Pipestill modifications and welding services. www.bp.com/us 

Zachry / CPChem, Borger, TX 2008 - Installed new internals in a new unit.  Please visit Zachry at www.zachry.com for more information regarding Zachry Industrial's scope of services.

PPG, Inc. 2007 - Sulphur, Louisiana - Unit Turnaround, performed maintenance of all towers during the shutdown, including replacing trays and hardware. www.ppg.com

Motiva Enterprises T/A 2007 - Port Arthur, Texas - Vacuum Pipestill No. 2 (VPS2), replaced tens of thousands of bubble caps, cleaned trays, installed new vessel stiffener ring.

Frontier Refining 2007, Kansas City, Kansas- replaced bottom head section of vessel and installed vessel sight glasses, and new nozzles.

Motiva Enterprises T/A 2006 - Port Arthur, Texas - Sulfur Block Turnaround - Opened, cleaned, inspected, repaired tower internals.  Installation of new reactor internals in HTU.

Calcasieu Refining 2006 - 20’-0” diameter Vacuum Tower revamp, installed new nozzles, wear plate repairs and replacement of vapor horn.  Installed new chimney trays, internal shroud (can section), and new distributors, supports and structured and grid style packings. www.calcasieurefining.com

BP America, Inc. 2007 - Texas City, Texas - 46'-0" ID Vacuum Tower, Replace random packings, grid packing, install new bottom vessel head, patch plates, and new nozzles per ASME. Also, performed tower maintenance on 21'-0" ID Atmospheric Tower, replacing trays, hardware, and making tray repairs and collector tray sump repairs.

AES Deepwater 2006 - Pasadena, Texas - Repaired spray headers & replaced (2) chevron mist eliminators in 33'-0" ID Column

Gas Plant 2006 - in Sheridan, Texas - Column revamp, modifying support rings and installing new trays in one column and provided routine maintenance and inspection on the Amine Still Column.

Fabrication Shop 2007 - Oklahoma City, Oklahoma - Installed new seal welded chimney trays and packing support grids in the shop.

Chemical Plant 2007 - Baytown, Texas  - Shutdown, involving three towers, very quick schedule to tunnel, clean, replace hardware, and close tray manways.

Westlake Petrochem - Lake Charles, LA - Installation of grid packing and distributors.

Chemical Plant - in Sulphur, LA - 9’-0" ID Tower internals maintenance, opening, inspecting, and replacing hardware on trays.

PEMEX - Veracruz, Mexico - Reactor internals removal and installation. 

PEMEX Tampico, Mexico- Vessel Section replacement.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Main Office Physical address:
2598 Wilson Rd, Humble, TX  77396
 
Telephone: 281-441-7314        
Fax: 281-441-7316

Texas City Office:

704 6th Street N, Texas City, Texas 77590

 

 
Copyright © 2005 Tray-Tec, Inc.
Last modified: 01/04/10