Our Experience
|

|
|
-
TOTAL Petrochemical 2008 Sulfolane / BTX Turnaround -
Tray-Tec performed all the tower work in the turnaround,
including a complete retray of 90 trays with tower attachment
modifications in a 10'-0" diameter tower.
-
PPG, Inc. - Sulphur, Louisiana - Unit Turnaround, performed
maintenance of all towers during the shutdown, including
replacing trays and hardware.
-
Motiva
Enterprises T/A - Port Arthur, Texas - Vacuum
Pipestill No. 2 (VPS2), replaced tens of thousands of bubble
caps, cleaned trays, installed new vessel stiffener ring.
-
Chemical facility, Kansas City, Kansas- replaced bottom head
section of vessel and installed vessel sight glasses, and new
nozzles.
-
Motiva
Enterprises T/A - Port Arthur, Texas - Sulfur
Block Turnaround - Opened, cleaned, inspected, repaired tower
internals. Installation of new reactor internals in HTU.
-
Calcasieu
Refining
- 20’-0” diameter Vacuum Tower revamp, installed new
nozzles, wear plate repairs and replacement of vapor horn.
Installed new chimney trays, internal shroud (can section), and
new distributors, supports and structured and grid style
packings.
-
BP America, Inc.
- Texas City, Texas - 46'-0" ID Vacuum Tower, Replace random
packings, grid packing, install new bottom vessel head, patch
plates, and new nozzles per ASME. Also, performed tower
maintenance on 21'-0" ID Atmospheric Tower, replacing trays,
hardware, and making tray repairs and collector tray sump
repairs.
-
AES Deepwater
- Pasadena, Texas - Repaired spray headers & replaced (2)
chevron mist eliminators in 33'-0" ID Column
-
Gas Plant -
in Sheridan, Texas - Column revamp, modifying support rings and
installing new trays in one column and provided routine
maintenance and inspection on the Amine Still Column.
-
Fabrication Shop - Oklahoma City, Oklahoma - Installed new
seal welded chimney trays and packing support grids in the shop.
-
Chemical Plant
- Baytown, Texas
-
Shutdown, involving three towers, very quick schedule to tunnel,
clean, replace hardware, and close tray manways.
-
Westlake
Petrochem - Lake Charles, LA - Installation of grid packing
and distributors.
-
Chemical Plant
- in Sulphur, LA - 9’-0" ID Tower internals maintenance,
opening, inspecting, and replacing hardware on trays.
-
PEMEX -
Veracruz, Mexico - Reactor internals removal and installation.
-
PEMEX Tampico, Mexico- Vessel Section replacement.
|
|

|
|
 |
|

|
|