TOTAL Petrochemical 2008 Sulfolane / BTX Turnaround -
Tray-Tec performed all the tower work in the turnaround,
including a complete retray of 90 trays with tower attachment
modifications in a 10'-0" diameter tower.
www.totalpetrochemicals.com
Husky Refining
2008- Modified existing internals in reactor, welded in new
Jaeger Products reactor internals. Visit Jaeger Products at
www.jaeger.com for
information regarding their internals.
Theraldson
Ethanol 2008 - Installed new AMISTCO trays in two 17'-0"
diameter towers. Visit AMISTCO at
www.amistco.com for
information regarding their internals.
BP America, Inc.
2008 - Vacuum Pipestill modifications and welding services.
www.bp.com/us
Zachry / CPChem,
Borger, TX 2008 - Installed new internals in a new unit.
Please visit Zachry at
www.zachry.com for more information regarding Zachry
Industrial's scope of services.
PPG, Inc. 2007 -
Sulphur, Louisiana - Unit Turnaround, performed
maintenance of all towers during the shutdown, including
replacing trays and hardware.
www.ppg.com
Motiva
Enterprises T/A 2007 - Port Arthur, Texas - Vacuum
Pipestill No. 2 (VPS2), replaced tens of thousands of bubble
caps, cleaned trays, installed new vessel stiffener ring.
Frontier Refining
2007, Kansas City, Kansas- replaced bottom head
section of vessel and installed vessel sight glasses, and new
nozzles.
Motiva
Enterprises T/A 2006 - Port Arthur, Texas - Sulfur
Block Turnaround - Opened, cleaned, inspected, repaired tower
internals. Installation of new reactor internals in HTU.
Calcasieu
Refining
2006 - 20’-0” diameter Vacuum Tower revamp, installed new
nozzles, wear plate repairs and replacement of vapor horn.
Installed new chimney trays, internal shroud (can section), and
new distributors, supports and structured and grid style
packings.
www.calcasieurefining.com
BP America, Inc.
2007 - Texas City, Texas - 46'-0" ID Vacuum Tower, Replace random
packings, grid packing, install new bottom vessel head, patch
plates, and new nozzles per ASME. Also, performed tower
maintenance on 21'-0" ID Atmospheric Tower, replacing trays,
hardware, and making tray repairs and collector tray sump
repairs.
AES Deepwater
2006 - Pasadena, Texas - Repaired spray headers & replaced (2)
chevron mist eliminators in 33'-0" ID Column
Gas Plant 2006 -
in Sheridan, Texas - Column revamp, modifying support rings and
installing new trays in one column and provided routine
maintenance and inspection on the Amine Still Column.
Fabrication Shop
2007 - Oklahoma City, Oklahoma - Installed new
seal welded chimney trays and packing support grids in the shop.
Chemical Plant
2007 - Baytown, Texas
- Shutdown, involving three towers, very quick schedule to tunnel,
clean, replace hardware, and close tray manways.
Westlake
Petrochem - Lake Charles, LA - Installation of grid packing
and distributors.
Chemical Plant
- in Sulphur, LA - 9’-0" ID Tower internals maintenance,
opening, inspecting, and replacing hardware on trays.
PEMEX -
Veracruz, Mexico - Reactor internals removal and installation.
PEMEX Tampico, Mexico- Vessel Section replacement.